In our latest video, C A Design Services (CADS) National Accounts Manager Mark Johnson introduces a short case study film outlining the collaborative approach between CADS and Pick Everard architects on a Level 2 BIM Project in Chelmsford.
The Riverside Ice and Leisure Centre is a major leisure redevelopment project which runs adjacent to the river Chelmer in the city. The Level 2 BIM project is due to be completed by the end of 2018 and provides an innovative design solution with the new building acting as a gateway to the city centre.
Appointed by Pick Everard at the outset, CADS advised on the development of the design strategy for the project, helping to reduce risk by delivering accurate and reliable information that could be used throughout by all parties with confidence.
Working closely with Pick Everard’s architects and structural engineers, our surveyors established the information requirements for the project, capturing the right scale of data, and constructing the 3D digital Revit model in a format that could be delivered direct to the architect’s desktop within the agreed budget.