Image of Riverside Ice and Leisure Centre video introduction thumbnail

Chelmsford Riverside Ice and Leisure Centre – a case study.

In our latest video, C A Design Services (CADS) National Accounts Manager Mark Johnson introduces a short case study film outlining the collaborative approach between CADS and Pick Everard architects on the Chelmsford based Riverside Ice and Leisure Centre – a major leisure redevelopment project based which runs adjacent to the river Chelmer in the city. The project is due to be completed by the end of 2018 and provides an innovative design solution with the new building acting as a gateway to the city centre.

Appointed by Pick Everard at the outset, CADS advised on the development of the design strategy for the project, helping to reduce risk by delivering accurate and reliable information that could be used throughout by all parties with confidence.

Working closely with Pick Everard’s architects and structural engineers, our surveyors established the information requirements for the project, capturing the right scale of data, and constructing the 3d digital Revit model in a format that could be delivered direct to the architect’s desktop within the agreed budget.

You can find the video on our videos page in the navigation menu above or by clicking here.

With over 30 years of experience in land and measured building surveying our CADS Survey team will provide you with an accurate and reliable measured survey delivered to your required specification. To discuss your project with us please do give Mark Johnson a call on 01493 412806.